Safety Box Production Line Simulation
0Cartons done
0In progress (WIP)
00:00:00Elapsed time
–Output / hour
–Est. total time
–Bottleneck
Stage times
All times are in seconds per carton, except the chamber, which is per whole batch. Tap + or − or type a number (decimals like 7.5 work).
Workers
Change any worker's task, remove them, or add more. Tasks with more than one worker in the same group run in parallel.
Line settings
Link distance to timeWhen you move something, walking time changes relative to the original layout
Stage names
Type any name you like; it updates on the map and in the lists instantly.
How to measure times accurately
- Time each stage while it is actually running, not while it waits for material.
- Run a stopwatch over 10 cartons in a row and divide by 10.
- Measure in the factory's current layout, since walking time is included. If you move things in the tool, it calculates the difference automatically.
- Roller: time one carton passing through. Worker 7: time the reverse fold, then the pull-out and stacking, each on its own.
- Chamber: time the whole batch (25 cartons).